Certified Asbestos Testing for VCT Floors
Vinyl composition tile hides two problems most companies won’t tell you about: adhesive that fights every pry bar, and a real chance the tile or the black mastic underneath it contains asbestos. We test first, remove second, and haul away everything when we’re done. Your floor comes up clean, safe, and ready for what’s next.
VCT stands for vinyl composition tile — the 9×9 or 12×12 tile found in older kitchens, basements, schools, and commercial buildings across Alberta. It was cheap to install and built to last, which is exactly why it’s so hard to remove decades later.
Yes, it can. Vinyl floor tile and the black cutback adhesive underneath it are two of the most common asbestos-containing materials found in Alberta homes and buildings built before the early 1990s. It isn’t dangerous while the tile sits intact on your floor — it becomes dangerous when it’s cut, sanded, ground, or pried up, because that’s when microscopic fibres release into the air.
Our crew is certified and trained specifically for asbestos abatement, not just general floor removal. Handling asbestos-containing material requires training beyond what a standard renovation crew receives.
Testing, abatement, and disposal are handled by the same crew, under the same appointment, following the practices set out in the Alberta Asbestos Abatement Manual. That’s the difference between a company that removes tile and a company that’s certified to handle what might be underneath it.
Cost depends on a few things — how many square feet of tile you have, how many layers are stacked on top of each other, how stubborn the adhesive is, and whether asbestos testing or abatement is part of the job.
| Cost Factor | How It Affects Price |
|---|---|
| Square footage | More tile, more labour and disposal weight |
| Number of tile layers | Each stacked layer adds time, material, and haul-away weight |
| Adhesive difficulty | Harder, older mastic or cutback adhesive takes longer to remove |
| Asbestos testing | Budgeted as a separate line item for pre-1990s floors |
| Asbestos abatement (if confirmed) | Adds cost for containment, specialized handling, and licensed disposal — not optional or negotiable |
We give you a free quote after seeing the floor and knowing what’s underneath it. No guessing, no surprises halfway through the job.
Yes, if the right tools and technique are used. VCT removal that gouges or scars the concrete underneath creates extra work and extra cost before new flooring can go down.
Whether you’re installing new vinyl, carpet, epoxy, or polished concrete afterward, the goal is the same: a smooth, level, reno-ready surface with nothing left behind to interfere with the next step.
The process stays the same everywhere we work: test first, remove safely, leave the floor ready.
If your building was constructed or renovated before the early 1990s, yes. Testing is the only way to know for certain. Newer installations are less likely to contain asbestos, but age alone isn’t a guarantee either way.
We move into abatement procedures. The area is sealed, the material is wetted and removed with non-powered tools, and everything is bagged and disposed of at a licensed facility. Nothing changes about your quote until we know what we’re dealing with.
A small room with a single layer of tile and no asbestos can be done in a few hours. A larger commercial space, multiple tile layers, or confirmed asbestos abatement can take a full day or more. We give you a timeline after assessing the floor.
Both. Tile removal without adhesive removal leaves a floor that still isn’t ready for new flooring. We take the job to bare, clean subfloor.
Certified asbestos testing. Safe, code-compliant removal. Complete haul-away when we’re done. Whatever is under your tile, we handle it start to finish.
Call us: 403-874-3000 (Calgary) | 780-977-2444 (Edmonton)
© 2026 Enviro Surface Removers Inc. All rights reserved.
Calgary: 403-874-3000 · Edmonton: 780-977-2444